PEDO Environmental Consultancy Projects

Environmental Consultancy Experiences of Pedoquasphere

Pedoquasphere International Limited is a dynamic company that has offered the following environmental related services and consultancy.

  • Government of Cross-River State-NEWMAP SPMU consultancy for the development of soil map to determine soil vulnerability to erosion in Cross River State (2017).
  • Environmental Impact Assessment of Etinan-Eket road construction, Akwa-Ibom State, Nigeria (2017).
  • Environmental Impact Assessment for Mark Sino Quarry, Akamkpa, Cross River State, Nigeria (2016)
  • Environmental Impact Assessment of Pineapple plantation for Dangote Group (2014), Cross-River State, Nigeria.
  • Soil Fertility study for Six states in the Niger Delta region of Nigeria, for the Federal Ministry of Environment, Nigeria (2013).
  • Soil Fertility study for three states in the south-south region of Nigeria, for the Federal Ministry of Environment, Nigeria (2012).
  • Soil Survey Fertility Investigation of Aya and Mbagidi Irrigation Projects. Commissioned by the Cross-River Basin Development Authority (CRBDA), Calabar, 2010.
  • Environmental Impact Assessment of Aya River Dam/Irrigation Projects in Ogoja Local Government Area, Cross River State. Commissioned by the Cross-River Basin Development Authority (CRBDA), Calabar, Cross River State for Strategic Hydro Services Limited, Abuja, 2009.
  • Environmental Impact Assessment of Oderegha Water Supply Project in Obubra Local Government Area, Cross River State. Commissioned by the Cross-River Basin Development Authority (CRBDA), Calabar, Cross River State (2009).
  • Environmental Impact Assessment of Itigidi Irrigation/Drainage and Flood Control Project in Abi Local Government Area, Cross River State. Commissioned by the Cross-River Basin Development Authority (CRBDA), Calabar-Nigeria. 2006.
  • Environmental Impact Assessment of Bunyia/Akatom Dam Project in Boki Local Government Area, Cross River State. Commissioned by the Cross-River Basin Development Authority (CRBDA), Calabar – Nigeria, 2006.
  • Environmental Impact Assessment (EIA) of Ijegu-Yala Dam/Irrigation project for Cross River Basin and Rural Development Authority in Cross River State, Calabar- Nigeria, 2004.
  • Environment Impact Assessment of ICS Power Limited Electricity Generation Plant Project in Alaoji, Ugunagbo Local Government Area, Abia State, Commissioned by ICS Power Limited, Abuja, 2004.
  • Environmental Post Impact Assessment of Oil Spill Polluted sites at Ekorinim Community in Calabar, Cross River State, Nigeria. Commissioned by NNPC/PPMC Limited Garki, Abuja, 2001.
  • Environmental Post Impact Survey of Coastal Waters of Akwa-Ibom State Occasioned by Mobil Oil Spill of November 22nd, 2003. Commissioned by Akwa Central Oil Spill and Environmental Watch, 2004.
  • Soil Survey and Socio-economic Survey of Owakande/Obubra Irrigation/Drainage/Flood Control Project in Obubra Local Government Area, Cross River State, Nigeria. Commissioned by Nigerian Society of Engineers, Calabar Branch, Calabar, 2006.
  • Soil Survey, Geotechnical Investigation and Socio-economic study of Itigidi Irrigation/Drainage and Flood Control Project. Commissioned by Aim Consultants Limited for Cross River Basin Development Authority (CRBDA), 2006.
  • Soil Survey and Fertility Investigation of Ijegu-Yala Dam/Irrigation project for Amana Consortium Nigeria Limited (2007).
  • Environmental Evaluation Report (EER) of Agabda Flow Station for SPDC, Port Harcourt.
  • Environmental Studies on the relationship between gas flaming and acid in SPDC locations, Port Harcourt.
  • Environmental Evaluation Report (EER) of Ukpomani tank farm and Batan metering station for Elf Petroleum Company, Warri.
  • Basic ecological studies of the Cross-River State Estuarine/Management System.
  • Environmental Evaluation Report (EER) of Bonny Terminal for SPDC, Port Harcourt.
  • Geotechnical Investigation of Ibafon Oil Deport Site located at Calabar Free Trade Zone (CFTZ), Calabar (2008)
  • Soil Fertility Evaluation in three Southern States (Cross River, Edo and Rivers), 2009. Commissioned by Federal Ministry of Agriculture and Water Resources, Garki, Abuja.
  • Geotechnical Investigation of ICS Power Limited Electricity Generation Plant Site located at Alaoji in Ugbunagbo Local Government Area, Abia State (2009)
  • Geotechnical Investigation of Romi Oil & Gas Limited Deport Site located at Calabar Free Trade Zone, Calabar, etc.
  • Environmental Impact Assessment of Biakpan, Etono and Ikun Water Projects in Biase Local Government Area, Cross River State (2009). Commissioned by Cross River Basin Development Authority, Calabar, and Cross River State.
  • Environmental Impact Assessment of Ibiono Ibom Dam Project, Ibiono Ibom, Akwa Ibom State. Commissioned by Cross River Basin Development Authority, Calabar, and Cross River State (2003)
  • Soil and Socio-economic Survey of Ogada Irrigation/Drainage/Flood Control Project in Obubra Local Government Area, Cross River State. Commissioned by Nigerian Society of Engineers, Calabar Brach, Calabar, Cross River State (2002)